In the period of 2011 - 2012 uur company carried out construction work on several industrial business facilities for the investor Institute of Field and Vegetable Crops, Novi Sad, on the location Rimski Šančevi, Novi Sad.
Processing center for seed materials
P = 700.00 m²
Work on the facade and roof panels (with substructure, canopies, flashings, metal works, ...)
YEAR BUILT: 2011.
Storage Center for seed materials
P = 6048.00 m²
Work on the facade and roof panels (with substructure, canopies, flashings, metal works, ...)
Year Built: 2012.
Additional storehouse
P = 350.00 m²
YEAR BUILT: 2012.