BRIDGE ZEMUN - BORČA

print
email
Last update by Mitar Papovic

INVESTOR: Directorate of Land and Construction of Belgrade
MAIN CONTRACTOR: China Road and Bridge Corporation Branch Serbia, Belgrade
YEAR BUILT: 2013.-

 

During the project, the construction of the bridge Zemun - Borca, our company carried out various works as a subcontractor of the General contractor China Road and Bridge Corporation Branch Serbia, Belgrade.
The scope of the work that we have done is divided into three distinct segments:

 

I and II - Access North Bridge - Part of the main bridge (297,00m), Railway Bridge (540,00m) and Sebeš Bridge (120.00m). At this stage of the project we perform construction work on the 3 small bridges, whose construction is composed of manufacturing and assembly of prefabricated longitudinal I beams, precast slabs, transverse beams and road structure. Works on the northern approach to the bridge were carried out in the period from November 2013 to July 2014 and were completed on time. Works on the Railway Bridge and Sebeš bridge began in June 2014 and will be completed during the summer of 2015.

 

III - Finishing works on the entire length of the main bridge (1500,00m), railway bridge (540,00m) and Sebeš bridges (120.00m). At this stage of the project we completed all finishing works involving the production and installation of precast barriers, side pedestrian paths, edge barriers (cast in situ) and median barriers (cast in situ). Works on the main bridge were carried out in the period from March 2014 to October 2014 and were completed on time. Works on the Railway Bridge and Sebeš bridge began in June 2014 and will be completed during the summer of 2015.

 

The Main bridge

 

 

 

 

 

Railway bridge and bridge Sebeš