Our company has performed complete construction works at several industrial facilities for investors KOTEKS-VISCOFAN Ltd. Novi Sad, the world leader in the production of food products from collagen mass.
Production hall with annexes (P, VP) and warehouse shelf storage (VP)
P = 6150 m²
The complete works (earthworks, AB prefabricated structures, installation of facade and roof panels with a substructure, metal works, works on the floor - concreting, works on the roads within the factory complex, water and sewage works, electric installation works and all other ancillary works)
YEAR BUILT: 2010-2011.
Upgrading of manufacturing facility
P = 374.00 m²
The complete works (earthworks, AB prefabricated structures, installation of facade and roof panels with a substructure, metal works, works on the floor - concreting, works on the roads within the factory complex, water and sewage works, electric installation works and all other ancillary works)
YEAR BUILT: 2012.